Company / Operations

From treatment to dispatch

AR Green’s production facility in Ras Al Khaimah connects water treatment, quality review, bottling, packaging, storage and dispatch.

AR GREEN / RAK — UAE

Production from Ras Al Khaimah.

Our Ras Al Khaimah manufacturing plant unites water purification, clean-room bottling, automated packaging, and fleet logistics together under one roof, providing dependable drinking water production for commercial clients across the UAE.

01

A purpose-built manufacturing plant

At our Ras Al Khaimah facility, water moves through treatment and purification before bottling in a controlled production environment. The operation is organised to support hygienic handling and traceable product flow.

02

The connected production journey

The production journey connects water treatment, quality checks, container preparation, filling, sealing, labelling and final packaging according to the applicable product and project specification.

  1. 01 Multi-stage filtration and reverse osmosis purification
  2. 02 Routine quality testing according to the production and quality-control programme
  3. 03 Container preparation, controlled filling and sealing
  4. 04 Batch identification, secondary packaging and dispatch preparation
  5. 05 Dedicated commercial fleet dispatch serving all seven Emirates
03

Finished-product storage and dispatch

Finished goods are stored and prepared for dispatch under the applicable handling and stock-rotation procedures. Delivery requirements are reviewed with corporate, hospitality and distribution customers.